Image source: pinflowes.com
Online Meeting
The UPJS and INO-HUB Energy held an online meeting with Pinflow Energy Storage. During this meeting the specifications for the kW test rig and the lab test rigs were discussed. The different components that the stack must present were depicted. Mounting equipment as well as training for TTK and UPJS are included in the offer. Note that the membrane and the sealing almost get glued when pressure is applied. The stack will be delivered as soons as possible in order to start with the experimental results.
Acknowledgement:
This work was supported by the project: IPCEI_IE_FLOW_BESS_012021