From Simulation to
Real-World Operation

Centre of innovative solutions where concepts become reality. We implement projects verified through simulations and fully tailored to the individual requirements of each customer. Get a BESS quote  

About Us

We combine technology, vision, and confidence in the future of energy. 

We are a team of experts delivering innovative solutions in energy systems, battery storage technologies, and digital energy management. 

Our goal is to help companies and organizations use energy more efficiently, safely, and economically. 

We rely on years of experience in business, technology, and energy system implementation, enabling us to connect state-of-the-art technologies with real customer needs. 

Understanding Customer Needs Solution Design Project Implementation
Understanding Customer Needs Solution Design Project Implementation Understanding Customer Needs Solution Design Project Implementation

References

Call for Proposals

Construction of the Kysucké Nové Mesto plant

PDF document · Call for Proposals

Decision to Cancel the Announced Call

PDF document · Decision to cancel the call

Prečo práve InoHub ?

Vízia

Vízia

Energetika budúcnosti musí byť inteligentná, flexibilná a ekonomicky udržateľná. Naša vízia spája technológiu, dátové modelovanie a prax, aby podniky získali skutočnú energetickú autonómiu.

Inovácie

Inovácie

Prinášame riešenia, ktoré vychádzajú z aplikovaného vývoja, AI modelov a digitálnych dvojčiat. Neustále posúvame hranice BESS technológií a riadenia energie.

Spoľahlivosť

Spoľahlivosť

Od návrhu až po prevádzku poskytujeme technológie s vysokou dostupnosťou, stabilným výkonom a dlhodobou podporou. Naša priorita je prevádzková istota klienta.

Efektivita

Efektivita

Každý projekt navrhujeme tak, aby prinášal merateľné úspory a maximálnu energetickú účinnosť. Zvyšujeme výkon, znižujeme straty a optimalizujeme životný cyklus úložiskových systémov.

Odbornosť

Odbornosť

Opierame sa o technickú kvalitu overenú nezávislými skúškami. Spolupracujeme s autoritami ako TÜV SÜD, aby boli naše riešenia bezpečné, certifikované a profesionálne integrované.

Ekonomickosť

Ekonomickosť

Naše riešenia dávajú ekonomický zmysel. Kombinujeme BESS, AI riadenie a energetické modelovanie tak, aby klient dosiahol rýchlejšiu návratnosť, stabilné cash flow a dlhodobé zníženie nákladov.

LIVE Stream

Battery Status
Connecting...
Last update: —
SOC: 0%
ANOLYTE
CATHOLYTE
0°C
STACK
0
kW
Simulation
0°C
PUMP
PUMP
Basic Metrics

Cycles Cumulative

0

Active Power AC

0 kW

Discharged Energy (Last cycle)

0 kWh

Outside air temperature

0°C

Battery Degradation

0.00%

Monthly: 0.00%
Disclaimer:

• Maximal DC power of battery is 72 kW
• Maximal stored energy for both modules is 80 kWh
• Typical cycle SOC range is 15% to 85%
• Cycles cumulative represent total number of cycles of both modules from 27.6.2025
• SOC represents average SOC level of both modules
• Active power AC represents total power of both modules
• Discharged energy represents DC energy discharged from Module 2 during one standard cycle
• Electrolyte temperature represents average value from both tanks for anolyte and catholyte
• Battery degradation is calculated from initial value of Module 2 after every 50–70 cycles of operation

The information published on this website, information about products, services and activities of INO-HUB Energy j.s.a. (including technical data and parameters of battery prototypes) is for informational purposes only and is not legally binding; INO-HUB Energy j.s.a. does not warrant its accuracy, completeness, reliability, applicability or timeliness, does not assume any warranty (including warranties of merchantability, non-infringement and suitability for a particular purpose), no obligation or liability with respect thereto, and shall not be liable for any damages or other loss resulting from the use of this information by any third party. The information may be changed or updated without notice.
Power and Temperature - History - 24 hours
Battery Degradation Comparison
Current Battery Status
0 cycles
Progress: 0.000%
Capacity: 100.00%
Expected Life: 20,000 cycles

Compare the degradation rates of Redox Flow Battery vs LFP (LiFePO4) Battery under the same load conditions:

System Images
Power and Temperature - History
No posts found

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025